Sunday, January 25, 2009

Flooring



The Anderson guys are really busting ass now. The plaster is done on two courts, and the flooring is pretty near finished on the first. After plastering, the guys worked on the flooring of court one. It's a pretty cool process. You may remember when we had the concrete floor put in, the concrete guys were told they have to be level within 1/8 inch over a 10 foot area. They did a pretty good job of it, but there are still some high and low spots.

The first thing the court guys do is shoot a grid of the entire court area. They put little dots every thirty inches and take a measurement on each dot to see how close they are to level. Each dot is assigned a measurement--0, 1, 2, or 3--which correspond with a certain thickness of rubber pad and shim.



After they get all the rubber pads figured out, they nail them to a section of wood and create a big lattice of wood on the floor, and then finally top it off with the top-grade maple, sand it with 40 grit paper to get a nice nap, paint the lines and we're good to go.

It's not the best description, but the point is, it's very time consuming, but the end result is a level floor that's nicely sprung.

Anyway, things are moving along really well with the courts. Apparently, our singer, Jordan, is hoping to be done with this job well in time for Valentine's day so he can head back to New York and to be with his sweetie. Isn't that nice?



Outside the courts, James, PJ and the Wyldewood crew are making great progress with the tiling, painting, and bar-like area behind the courts.