Friday, November 21, 2008

Framing



The concrete is poured and now the framing begins. The first couple of days after the concrete was poured was spent lining out exactly where the walls are going to go. The guys took measurements to see how close the architectural drawings are to reality, and things were pretty close. However, they had to make a few small corrections here and there. Next thing to do is to install metal tracks that outline the walls and then insert the framing. Some of the tracks have to be attached to the ceiling as well. which requires the guys to work on a lift. All of this work is painstakingly slow for now, but once the tracks are in, the framing should go relatively quickly.

The other thing the guys did was "shoot a grid" of the slab where the courts are going to be. They used a combination of lasers and chalk lines to see just how close we are to being perfectly level. The plot points on the grid are put into some sort of computer program which then plots out exactly where the high and low spots are over the entire slab. To make a long story short, the bulk of the slab is within 1/8inch of level. A couple high spots will be leveled with some sort of concrete sander thing, and only one low spot will have to be shimmed by the flooring people. Considering that this slab alone is almost 3000 sq. ft., to be off by as little as they were is quite impressive. The General Contractor James, of Wyldewood Construction is pretty pleased with how close the concrete guys came to perfect.

So that's one big hurdle. The next one is the walls. These have to be straight and plumb within 1/8inch. That will be quite a challenge. I'm not sure when they are going to start their work, but probably in the next week or so.

No comments: